M1008 Cargo Cover virgin installation instructions

From: Bruce Beattie (bruce@eecs.berkeley.edu)
Date: Thu Jul 15 2004 - 21:35:17 PDT


Eh, Eh, don't jump to conclusions....

When the M1008 CUCV comes from the factory, it does not have holes
drilled in the
top of the bed sides to mount the Cargo Cover kit.

Does anyone have a copy of the instructions for doing this initial
drilling? Hopefully
it has dimensions.

In my case Soldier A and Soldier B had just managed to heist a case of
beer before
attempting to do this, and needless to say the holes don't even match
the holes on the brackets.

Thanks,
Bruce MVPA 23824



This archive was generated by hypermail 2.1.4 : Sat May 07 2005 - 20:33:53 PDT